Oklahoma City

Oklahoma City Oklahoma

Video and Model Details

Video

The Grounds at Oklahoma Temple are very different. You cannot walk around the temple itself, typically. There is a large expanse of grounds around the temple that are publicly open, and a fountain with risers around the outer boundary that is fenced off independently from the temple and the rest of the grounds.

I also like Oklahoma City due to it being the Mission that my favorite Bishop as a young man is currently serving as Mission President over.

Audio

Water 1 – UncleSigmund
JulyInsectChoruskvgarlic

Technical

Modeled: 2.x
Render: Cycles

Whole Scene

Vertices:

 

Faces:

 

Objects:

 

File Size:

Temple Only

Vertices:

 

Faces:

 

Objects:

 

File Size:

Renders

Database

test
test
Error! Filename not specified.

Timeline

Announced

Date   March 14, 1999  
By      
Position      
Via      

Groundbreaking

Date   July 3, 1999, by Elder Rex D. Pinegar of the Seventy  
By      
Position      
Attending      

Open House

Dates      
Days     [counted]
Visitors      
Per Diem     [calculated]

Open House

Dates      
Participants      
Stakes      
Location      
Title      

Dedication

Date   July 30, 2000, by President James E. Faust, second counselor in the First Presidency
4 sessions.
 
By      
Position      
Sessions      
Attending      
Per Session     [calculated]
Dedication Order     [chronology]
Dedicatory Prayer      

Commencement

Date      

Presidents

Specifications

Location

Physical Address

12030 North Mustang Road, Yukon, OK 73099-9801  

Mailing Address

   

Phone

Phone      
Fax      
City      
County      
State      
Country      
GenCode      

Dimensions

Height

Official    
Meters     [calculated]
 Feet      
Estimated    
[Modelling Tools]
Meters      
Feet      

Height Sans Moroni

Official    
Meters     [calculated]
Feet      
[Modelling Tools]
Meters      
Feet      

Height Sans Spire

Official    
Meters     [calculated]
Feet      
[Modelling Tools]
Meters      
Feet      

Width

Official    
Meters     [calculated]
 Feet   77  
Estimated    
[Sat Image measuring tools]
 Meters      
Feet      

Length

Official    
 Meters     [calculated]
 Feet   149  
Estimated    
[Sat Image measuring tools]
 Meters      
 Feet      

Official Area

Meters      
Feet   10,700  

Footprint

[Sat Image measuring tools]
Meters   -NA-  
Feet   -NA-  
Above      
Basement      

Church Owned Property

Error! Filename not specified.

Official    
Meters2     [calculated]
Acres 1.05  
Estimate    
[Sat Image measuring tools]
Meters2      
Acres      

Temple Plat

Error! Filename not specified.

Estimate    
[Sat Image measuring tools]
Meters2      
Acres      

Coordinates

[Sat Image measuring tools]
Latitude      
Longitude      

Elevation

[Sat Image measuring tools]
Meters      
Feet      

Temple Rotation

[Observation]
Long Axis Alignment      
AKA      
Entryway Alignment      
AKA      

Temple Design

Exterior

Cladding

Error! Filename not specified.

Type      
Source      
Image Source    

Roofing

Windows

Type      
Trim Color      

Inscriptions

First

Error! Filename not specified.

[Observation]
 
Location    
Type      
Language      

Second

Error! Filename not specified.

[Observation]
 
Location    
Type      
Language      

Third

Error! Filename not specified.

[Observation]
 
Location    
Type      
Language      

Symbolism

Cornerstone

Error! Filename not specified.

[Observation]
 
Location    
Type      
Language      

 

Spires and Moroni

Spires

[Observation]
Number      
Location    

Moroni

[Original Research, Observation]
Sculptor      
Version    
Placed      
Faces      
Height    
Meters      
Feet      

Error! Filename not specified.

Error! Filename not specified.

Interior

Interior

 

Rooms

Endowment

Rooms      
Type      

Sealing

Rooms   Celestial room, baptistry, two ordinance rooms, two sealing rooms  

Services Rooms

Cafeteria      
Clothing Rental      

Contractors

Designers

Architect   Richard Lueb of the Architectural Partnership  
Also Did      
Interior Designer      
Also Did      

Project Manager

Manager   Leon Rowley  
Also Did      

General Contractor

Contractor   Arnell-West Inc  
Also Did      

Additional Contractors

Sources and Links

Additional Links/Info

 

 

Sources/Citation

 

Comments

So empty here ... leave a comment!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Sidebar